Above-ground storage tanks hold critical products, from crude oil to water. Their structural integrity directly impacts safety, environmental protection, and operational continuity. The American Petroleum Institute’s Standard 653, provides the definitive framework for maintaining these assets.

In this article we will discuss common repair methods and essential practices dictated by this standard, guiding owners and operators in effective tank management. Adherence to these protocols defines the work scope for any competent inspector or contractor servicing an API 653 tank.

Common Repair Methodologies:

The standard sanctions several repair techniques, selected based on the inspection findings. For localized shell corrosion, operators often use welded patch plates. This method involves installing a new plate over the prepared damaged area, with specific rules governing plate size, weld joint design, and heat input control to manage stress. For larger areas of thinning, contractors may insert a replacement shell course, a more extensive operation requiring careful cutting, alignment, and welding of an entirely new ring of steel.

For floor repairs, contractors commonly employ partial or full-floor replacement. They cut out corroded sections and install new plates with welded bottom seams. The standard provides strict guidelines for welding sequences and testing to prevent distortion and ensure leak-tightness.

In roof structures, repair methods include replacing damaged rafters, repairing pontoons on floating roofs, or adding stiffeners to address structural deficiencies identified during inspection.

Essential Practices for Successful Repairs:

Success in tank repair hinges on rigorous preparation and execution. A detailed repair plan, developed before any work begins, is mandatory. This plan must define the repair scope, list approved procedures, and specify all materials. It requires review and acceptance by an authorized inspector.

Qualified personnel perform all tasks. Welders must hold certifications for the specific processes and materials used in the repair. Non-destructive examination (NDE) technicians apply methods like liquid penetrant testing, magnetic particle testing, radiography, or ultrasonic testing to verify weld quality. The authorized inspector oversees the entire process, verifying compliance with the approved plan and the API 653 standard at each stage.

The Central Role of Inspection:

Inspection is not a separate activity but a continuous thread through any repair project. Post-weld heat treatment might be necessary for certain thicknesses or materials to relieve residual stresses. After completing repairs, the inspector typically requires a final leak test, such as a vacuum box test on floor seams or a hydrostatic test for the entire tank. This final verification confirms the repair restores the tank to a sound, leak-free condition.

Related Posts

Popular News

Modular Kitchen Design Plans

admin | April 30, 2020 | 0

A modular property is very diverse as compared to a constructed or camper. The form or scale is able to be all sizes as well as shapes. When you buy…

Archives

Categories